Preparing to install on board weighing
system.
|
|
 |
|
Flat bed weigh car in docking area.
Crane is about to lift deck to install weigh system.
|
|
 |
|
Re-installing deck of weigh car.
|
|
 |
|
Wiring the just installed weigh system.
|
|
 |
|
Grapple (on locomotive) and scrap
bucket (on weigh car). In between is a "teepee" car to divert
dropped scrap.
|
|
 |
|
Grapple unloading into scrap bucket.
|
|
 |
|
Good view of scrap bucket, weigh car,
teepee car, and grapple locomotive.
|
|
 |
|
Empty Ladle carrier.
|
|
 |
|
Ladle carrier underway with 400,000 lbs
of scrap. The ladle when empty weighs 120,000 lbs. |